Powered by ZigaForm version 3.9.7.3
Tel: 08 8358 5444 Fax: 08 8298 9666

Latest News

Grant Thornton 43

Grant Thornton Fitout

Share

Weslec carried out the electrical and data installation on this project for Emmett Construct.

The fitout involved the installation of a new distribution board with the addition of Dynalite lighting control system to provide automation for the lighting throughout the tenancy. LED lighting was used with dimmable fittings in the board room and meeting rooms.

General power and a Category 6 data cabling system was installed to workstations and offices with floor boxes used extensively to bring services into rooms and under tables.